In this paper, a model on joint decisions of subcontracting and detailed orders cheduling is considered. In this model an order can be either processed by uniform machinest the manufacturer in-house or subcontracted to one of the several available subcontractors ossibly for processing at a high cost. The manufacturer needs to determine which orders hould be produced in-house and which orders should be subcontracted. Furthermore, it needs to determine a production schedule for orders to be produced in-house. The objective is to minimize the total production and subcontracting cost, subject to a constraint on the maximum completion time of the orders. The computational complexity of the model is analyzed, an approximation algorithm by using mathematical programming is developed and its worst-case and asymptotic performance are given.
CHEN Rongjun, TANG Guochun.
SUPPLY CHAIN SCHEDULING WITH SUBCONTRACTING OPTIONS UNDER UNIFORM MACHINES. Journal of Systems Science and Mathematical Sciences, 2012, 32(1): 53-61 https://doi.org/10.12341/jssms11773